1. First, see where the money really goes
Most cost discussions stay fuzzy. That’s not useful when you’re trying to shave 15–25% off your CNC spend without annoying your quality team.
A typical CNC part (say an aluminum manifold) often breaks down roughly like this: machine time around 40–60% of total, setup and programming together 15–30%, material 15–25%, and the rest split between inspection and finishing.
Here’s a simple way to look at it:
Cost bucket
Ballpark share of part cost*
Who moves it most
Practical lever
Machine cutting time
40–60%
Engineer + supplier
Geometry, tool access, material, tolerances
Setup & programming
10–30%
Engineer + buyer
Fewer setups, batch size, repeat orders
Material & blank
15–25%
Engineer + buyer
Material grade, stock form, bar vs block
Inspection & QA
5–15%
Engineer
Tolerance scheme, datum strategy, sampling plan
Finishing & extras
5–20%
Engineer + buyer
Surface spec, coatings, engraving, packaging
*Ranges pulled from recent cost guides for aluminum parts and typical machine-shop structures.
If you don’t touch geometry, tolerances, or volume, you’re basically asking the supplier to do magic. That rarely works.
2. Geometry: stop punishing the cutter
This is where most hidden money sits. And where most drawings are quietly burning cash.
2.1 Internal corners and pockets
Several recent DFM guides repeat the same rule of thumb:
Corner radius ≥ 1/3 of cavity depth.
Depth of pockets ≤ 4× tool diameter or cavity width.
Why it matters you already know: small tools, more passes, more chatter, more time.
Engineer moves
Change “deep, sharp pocket” to “shallower pocket with generous radius”:
Example: 12 mm deep, R0.5 → 8 mm deep, R3.
Reuse one or two standard radii across the whole part so the programmer doesn’t keep swapping tools.
Open up blind pockets when you can. A through-slot is almost always cheaper than a deep, blind one.
Buyer moves
When you review a quote, ask a simple question:“Show me one geometry tweak that would cut cycle time without affecting function.”
If three suppliers all complain about the same pocket, that feature is probably your cost anchor.
2.2 Wall thickness and feature “bravery”
Most articles warn against thin walls and non-machinable shapes, especially in milled and turned parts. Thin walls flex, ring, and force the shop to slow down feeds dramatically.
Engineer moves
For general aluminum structural parts:
Try to keep walls ≥ 1.5–2.0 mm unless there is a real functional reason.
Avoid “looks cool” ribs and tiny fins unless they are doing a job (thermal, airflow, EMI).
On turned parts, watch for deep grooves and fancy undercuts that need custom tools or live tooling.
Buyer moves
Flag drawings that look “delicate” and ask engineering:
“Is this wall thickness performance-critical, or could we add 0.5–1.0 mm and save machining time?”
2.3 Standardize holes, threads, and patterns
Guides from multiple shops repeat the same suggestion: use standard drill sizes and common thread types (M6, M8, ¼-20, etc.), and keep hole depths reasonable. Non-standard features lead to special tools, more setups, or slower feeds.
Engineer moves
Snap hole sizes to the nearest standard drill from your supplier’s list.
Avoid specifying threads deeper than ~2–2.5× diameter unless necessary.
Pattern holes on a simple grid or bolt-circle. Fancy irregular layouts cost in programming and inspection.
Buyer moves
When sending RFQs, include a note:“If any hole/thread can be standardized without changing function, please suggest it with a cost delta.”
That sentence alone often triggers free DFM from the shop.
3. Tolerances: tight where needed, boring everywhere else
Most cost-optimization pieces say the same thing: over-tight tolerances drive machine time, inspection time, and scrap. But they rarely tell you how to structure tolerances in a practical way.
Features that affect assembly but have some slack.
Medium tolerances (for example ±0.05–0.1 mm for many metal parts).
Tier C – Structural / cosmetic
Brackets, covers, non-locating faces.
General title-block tolerances (±0.1–0.2 mm or looser).
And label these tiers clearly on the drawing or in a tolerance map, instead of forcing the machinist to guess what really matters.
3.2 Simplify datums and inspection work
Complex datum schemes with six different primary setups look clever on paper and slow on the granite table.
Engineer moves
Try to align datums with how the part is actually fixtured in the machine.
Minimize the number of critical dimensions that require CMM time; use functional gauges where possible.
Group related tolerances so they can be checked in one setup.
Buyer moves
Ask for separate line items (or at least internal estimates) for:
Machining time vs. inspection time.
If inspection is 20–30% of the cost on a relatively simple part, your tolerance scheme is probably over-done.
4. Material and blank decisions: cost isn’t just the kilo price
Almost every cost guide points out the same pattern: easy-to-machine materials (6061 aluminum, many plastics) cut much faster than stainless, copper alloys, or titanium. That’s not news. But the practical part is tying that to design decisions.
4.1 Match material to real loads, not “just in case”
Engineer moves
For non-corrosive environments and moderate loads, question default use of:
304/316 stainless where 6061 or 7075 would work.
High-end copper alloys where a cheaper grade is fine.
For housings, covers, brackets:
Often an engineering plastic is enough for prototypes or low-load parts and machines quickly.
Buyer moves
In RFQs, clearly separate:
“Material must be exactly X grade”
vs. “Properties must be at least: yield ≥ Y, hardness ≤ Z…”
Give suppliers the room to suggest equivalents. Many will.
4.2 Blank size and stock form
Several DFM articles point out that material utilization becomes a bigger lever at high volumes or with large blocks. On smaller, typical parts, shops often recycle offcuts efficiently, so chasing every last cubic centimeter isn’t worth the effort.
Engineer + buyer moves
For large parts, check:
Can you reduce one dimension slightly to fit a standard plate thickness or bar size?
For high-volume parts:
Ask if saw-cut blocks, near-net shapes, or extrusions would reduce machining time.
5. Finish, deburr, and the “nice-to-haves”
A lot of cost hides in the last 10% of the process: deburring, finishing, branding, cosmetic perfection.
Guides on optical parts and precision machining repeat the same warning: specifying a very fine surface roughness on every face is a sure way to make the quote jump.
5.1 Build a finish map, not a wish list
Engineer moves
Create a simple three-level map:
Finish A – functional surfaces
Seals, bearings, sliding interfaces.
Specify exact Ra and process if needed.
Finish B – visible but non-critical
Faces customers see.
Standard “as machined” or one simple bead-blast / anodize spec.
Finish C – hidden
Interior cavities, mounting faces.
Leave as-machined unless there’s a real reason.
5.2 Logos, marking, and edges
Engraved text and deep logos need small tools and extra passes. Several shops explicitly call this out as a cost inflator.
Sharp edges everywhere mean more deburring time.
Engineer moves
Swap deep engraved logos for:
Laser marking or simple dot-peen after machining.
Use a global edge break note (e.g. “Break all sharp edges 0.2–0.5 mm”) instead of dimensioning every chamfer.
Buyer moves
If branding is not functional, treat it as a separate cost decision:
“We’re willing to pay X% extra per part to have the logo milled instead of laser-marked” Then at least it’s a conscious trade-off.
6. Setups, tool changes, and machine choice
Setup count and machine selection often decide whether a part makes sense on a 3-axis at $20–30/h or needs a multi-axis machine at roughly double that rate.
6.1 Aim for fewer, smarter setups
Tracking data on setups shows a clear pattern: the more times a part leaves a fixture, the more time and risk you add.
Engineer moves
Align key features so they can be reached in two main setups.
Avoid features that require the part to be clamped at strange angles unless they truly matter.
Make one face the “home base” datum that most features reference.
Buyer moves
Ask suppliers:
“How many setups does this part require in your current process?”
“What change would remove one setup?”
For simple parts, push back gently if someone claims four or five setups; often it signals suboptimal fixturing rather than necessity.
6.2 Choose the right class of machine
Simple prismatic parts with features on 2–3 sides usually belong on 3-axis mills.
Only move to 4/5-axis when:
You genuinely need features from many angles,
Or you’re eliminating multiple setups and the math still works at the higher hourly rate.
Engineer + buyer moves
When quoting, explicitly ask suppliers to:
“Quote on 3-axis where possible; note if 5-axis is required and why.”
This stops silent upgrades to more expensive machines just because they’re free on the shop floor that day.
7. RFQ strategy: get better pricing without grinding on margins
Nearly every modern DFM and cost-reduction guide says the same thing: most of the machining cost is locked in when the RFQ goes out, not when the spindle starts turning.
So the RFQ package matters more than small negotiations later.
7.1 What to send (minimum effective RFQ)
Engineer provides
3D model (STEP/Parasolid) plus a clean 2D drawing that shows:
Tolerance tiers (A/B/C), not just a crowded dimension soup.
Finish map.
Critical datums and functional notes.
Expected annual volume and likely reorder pattern.
What is actually safety-critical or customer-visible.
Buyer adds
Preferred delivery batch sizes (so the shop can plan setups).
Quality expectations (PPAP, specific certifications, 100% inspection or sampling plan).
Invitation for DFM:“Cost-down suggestions are welcome. Please quote both original and suggested version where possible.”
This kind of RFQ signals “we’re serious, and we know what we’re doing”. You tend to get sharper thinking from good shops when you send it.
7.2 Batch size: where the savings usually appear
Using one published example for a small aluminum part: material might be around $10; setup and programming could be over $100 combined for the first piece. For a batch of 25, that overhead per part drops to just a few dollars, and machining time becomes the dominant piece.
Engineer + buyer moves
For repeating parts, don’t order 5 pcs every month if you can order 20 once per quarter.
Check where the price per part “flattens” on quotes (e.g. 20 vs 50 vs 100 pcs) and set your standard order quantity near that knee.
8. After PO: keep squeezing waste without touching quality
Once a part is in production, most teams stop thinking about it. But the shop keeps learning things on the floor.
Setup-tracking and DFM checklists from modern manufacturing tools make it clear: small design tweaks on repeat parts often cut cycle time by 10–20% with no functional impact.
Engineer moves
For repeat orders, ask the supplier once a year:
“If we allowed one drawing change, what would you modify to cut time?”
Be willing to:
Add corner radii,
Relax non-critical tolerances,
Re-route oil holes or non-critical pockets.
Buyer moves
Track cost on top-spend parts annually.
If a part hasn’t changed but the volume has grown, revisit:
Batch size,
Long-term agreements tied to design optimizations.
Quick checklist for your next CNC part
You can use this as an internal pre-RFQ sanity check.
For engineers
[ ] Internal corners generous and standardized?
[ ] Pocket depths ≤ 4× width, walls ≥ 1.5–2.0 mm where possible?
[ ] Three-tier tolerance scheme instead of copy-pasted tight tolerances?
[ ] Finish map with A/B/C levels, not “fine everywhere by default”?
[ ] Material chosen for real environment and loads, not habit?
[ ] Datums match realistic machine setups?
For buyers
[ ] RFQ package includes 3D + clear 2D + volume and quality expectations?
[ ] You’ve explicitly invited DFM suggestions?
[ ] You know which features are negotiable vs. locked?
[ ] Batch size chosen near the cost “knee”, not just the monthly consumption?
[ ] Top CNC parts reviewed yearly for design-driven cost-down?
FAQ: CNC machining cost reduction, without the fluff
1. How much cost can I realistically remove without hurting quality?
Most design-for-manufacture case studies report 15–30% savings when teams clean up geometry, tolerances, and finishes early, especially on parts that were never optimized in the first place. If your drawings are “legacy” and full of “just in case” specs, the upside can be higher.
2. Is it always bad to specify tight tolerances?
No. It’s bad to specify tight tolerances by default. Use your tightest zone only where the part function or safety case proves it’s needed. For everything else, pick a general tolerance that machining can hit easily and inspection can verify quickly. Multiple cost guides highlight tolerance as one of the strongest price drivers, right after geometry complexity and material.
3. Does 5-axis machining always cost more?
Hourly rates are usually higher for 4/5-axis machines than for basic 3-axis equipment. But if 5-axis lets the shop: Cut setups from four to one, Reach all features in one clamping, Remove more material per hour, the total part cost can still drop. It depends on the geometry and volume. Use 5-axis when it removes real effort, not just because it sounds advanced.
4. Is material cost really such a big lever?
Depends on the part. For typical aluminum CNC parts, material might be 15–25% of the total cost; machining time is usually the bigger driver. That said, when you jump from 6061 to difficult alloys or high-end copper, both material price and machining time increase. So the lever is really “material choice × machinability”, not just raw price per kilo.
5. How do I compare quotes fairly across suppliers?
Keep it boring and structured: Same 3D and 2D package to all suppliers. Same volume assumptions and delivery pattern. Ask each supplier to note: Assumed setups, Machine type, Any suggested design changes with their cost impact. If one shop is 30% cheaper but uses a very different process assumption, you can decide whether that approach is acceptable for your quality and risk profile, instead of guessing.
6. When should I involve my machining supplier in design?
Earlier than you think. Cost-reduction and DFM resources consistently show that changes made before final drawing release have outsized effect on cost. Once tooling, fixtures, and inspection routines are locked, every change is painful. Loop a trusted supplier in when your design is “80% done but still flexible”. That’s usually where the cheap geometry edits live.
A dedicated Senior Application Engineer at Istar Machining
with a strong passion for precision manufacturing. He holds a background in Mechanical Engineering and possesses extensive hands-on CNC experience. At Istar Machining, Cheney focuses on optimizing machining processes and applying innovative techniques to achieve high-quality results.
New Product Brochure
Please enter your email address below and we will send you the latest brochure!